Service / Bathroom remodel

Bathroom Remodel In Rehoboth Beach

  • Licensed & Insured
  • Rehoboth Beach, DE
  • 75+ Projects

Coastal Home Improvements designs and builds custom bathroom remodels across Rehoboth Beach, Lewes, and Sussex County. Whether it's new tile and fixtures or a full layout rebuild, every project gets the same standard of detail and clean, controlled work.

  • 75+

    Projects Completed

  • 16 Years

    On the Coast

  • Owner

    On Every Build

Bathroom remodels

01 / What's included

What's Included in a Bathroom Remodel

Our bathroom remodels cover everything from refreshed primary baths to powder-room conversions and tub-to-shower upgrades. We coordinate every trade so the finished space looks intentional, drains correctly, and lasts.

  • 01

    Demo and tile removal

    Floor protection, controlled demo, careful debris removal — site stays sealed off.

  • 02

    Tile, stone, and waterproofing

    Substrate prep, layout, set, grout, and sealed transitions where the water lives.

  • 03

    Vanity, mirror, and lighting

    Plumbing rough-in, level mount, fixture wiring, and hardware install.

  • 04

    Shower, tub, and fixtures

    Drain alignment, valve install, and glass enclosure setup — built to spec.

  • 05

    Plumbing and electrical updates

    Code-aligned roughs, supply lines, dedicated circuits, and GFCI protection.

  • 06

    Drywall, paint, and trim

    Patches, skim coat, caulk, casing, baseboard, and finish paint.

  • 07

    Final walkthrough and punch list

    We walk every detail with you, knock out touch-ups, and sign off together.

02 / Process

How a Bathroom Remodel Works

  1. Phase 0160–90 min

    On-Site Visit

    We come to your home, look at the bath, and talk through what's working, what isn't, and what you want changed. Layout, fixtures, finishes — all on the table.

  2. Phase 021–2 weeks

    Selections & Proposal

    We help coordinate tile, vanities, fixtures, and finishes, then send a written proposal with scope, materials, and timeline laid out clearly.

  3. Phase 03Pre-build

    Build Prep

    Floors and adjacent rooms get covered, the work zone gets sealed off, and materials get staged before demo starts. The rest of your home stays usable.

  4. Phase 044–8 weeks

    Build

    Demo, plumbing, electrical, tile, fixtures, and finish work all coordinated on one schedule. You'll get proactive updates so you always know what's next.

  5. Phase 05Post-build

    Walkthrough & Follow-Up

    We walk the bathroom with you, work through any final touch-ups, and follow up after handoff to make sure everything stays right.

03 / Recent work

Recent Bathroom Remodels

A small selection of recent bathroom projects in and around Rehoboth Beach.

P-01 / 10·Rehoboth Beach, DE

Closet-to-Powder-Room Conversion

04 / Why choose us

Why Choose Coastal for Your Bathroom Remodel

  • 01

    Tile Detail Where It Counts

    Bathrooms live and die on the small stuff — straight grout lines, clean transitions, properly waterproofed showers. We sweat the details that show up every morning.

  • 02

    Clean Work, Sealed Off

    Bathroom remodels generate a lot of dust. We seal the work zone and cover floors so the rest of the home stays livable.

  • 03

    One Team, One Timeline

    Plumbing, electrical, tile, glass — all coordinated under one roof on one schedule.

  • 04

    Owner-Led, Start to Finish

    Miguel runs every project. The person who quoted your bathroom is the same person walking the punch list with you.

05 / Start

Ready to Remodel Your Bathroom?

Tell us about the project through the form or give us a call. We'll come out, walk the space with you, and send a clear written proposal — no pressure, no surprises.

Free on-site quotesLicensed, bonded & insuredOwner on every projectSatisfaction guarantee

06 / FAQ

Common Questions About Bathroom Remodels

  • How much does a bathroom remodel cost in Rehoboth Beach?

    Most of our bathroom remodels start in the $25,000–$50,000 range and scale up based on size, layout changes, and finish level. We send a written proposal with real numbers after the on-site visit.

  • How long does a bathroom remodel take?

    Typical bathroom remodels run 4–8 weeks. Larger primary baths and full layout changes take longer; smaller refreshes go faster.

  • Can I still use the bathroom during the remodel?

    The bathroom being remodeled, no. If it's the only full bath in the home, we'll talk through that before signing. We seal off the work zone so the rest of the home stays usable.

  • Do you handle tub-to-shower conversions?

    Yes — full conversions including tile work, glass enclosures, plumbing, and waterproofing.

  • How do you handle changes mid-project?

    We price every change in writing before any extra work happens. Same rule applies to anything unexpected we find behind a wall.

  • What areas do you serve?

    We work across Rehoboth Beach, Lewes, Georgetown, Milton, Dewey Beach, and Slaughter Beach, with a 50-mile radius from Rehoboth.

08 / Service area

Where we work.

We work across the Delaware coast, with a 50-mile service radius from Rehoboth Beach. If you're nearby and don't see your town listed, give us a call — we may already be working in your neighborhood.